Research News
-
The 2013 Annual Working Meeting of the Project "Key Technology Research in Efficient Biogas Manufacturing through Energy Herb" is held in HaikouMar 22, 2013
-
The Project“Preparation of Bill of Greenhouse Gases in GuangDong Industrial Processes” has Passed Acceptance InspectionFeb 06, 2013
-
The 2012 Annual Workshop of the Project “Key Technology Research and Engineering Demonstration of Vehicle Bio-fuels’ Preparation, Upgrading and delivering” is Held in BeijingFeb 01, 2013
-
The Sharp Eagle Wave Energy Converter Yields New ProgressJan 10, 2013
-
Intercommunion Meetings of Research Project “The study on the grassland energy-plants breeding and the advanced liquid fuels production by chemical catalysis " is Held in GuangZhouDec 20, 2012
-
Progress Report Meeting of the Project “Key Technology and Demonstration of 1000 t/y scaled liquid fuel production by biomass gasification” is Held in GuangzhouNov 09, 2012
-
New Progresses Made in Simulation Software R&D of Mid- Low Temperature Waste Heat and Geothermal Power Generation SystemOct 17, 2012
-
The Guangdong Provincial International Project “Joint Research&Application Demonstration of Producing DME Synthesisly Through Biomass Gasification ” Passed Acceptance InspectionOct 17, 2012
-
The Project “Biomass Efficient Transformation and Bio-refinery” Achieved Important ProgressSep 20, 2012
-
The 863 Project “Efficient Biomass transformation and biorefinery” Passed Acceptance InspectionSep 13, 2012